The Trigger monitor event can be used to execute a monitor test at a given time. This can be useful for monitors that should only be tested on a very specific time during a period, for example. Once a monitor is scheduled for a test, it is no longer tested periodically as normal.
Note: See the Schedules tab topic for an introduction to scheduling events.
Event settings